Joint Water
Waste water treatment plant using turbines and Internal combustion engines for co-generation. Project design is 200 scfm at 350 psig. The SAGTM system was designed to remove all siloxanes to low ppb levels for power generation equipment protection, this is a partial-scale pilot design. The full scale application would be approximately 9,000 scfm at 350 psig.
Here are a few pictures of the project:


Please contact us via the following:
P: 425-334-5505
F: 360-363-1012
Address:
3330 Bickford Avenue, Box 1
Snohomish, WA 98290
E-mail:
For general information and sales

